Coming in Q4 2026
Scale EV charging without upgrading your grid
Smart Energy Management helps your sites expand EV charging capacity by orchestrating charging and building loads within your existing grid connection.
6 – 18 months
Typical lead time for grid upgrades in congested areas
€50k – 500k+
Potential cost of grid reinforcement per commercial site
30-60%
Of grid capacity often unused at off-peak – but locked away
The approach
Cloud simplicity. Local control where it adds value
Not every site needs the same deployment model. Our Smart Energy Management proposition offers a flexible approach – cloud-first where it fits, with local control where site-level precision matters.
Typical market pressure points by country
Widespread grid congestion and waiting lists for new connections. Many sites cannot expand without years of delay.
Emerging local congestion in urban areas. Growing need to make better use of existing grid capacity.
New regulation (§14a EnWG) requires controlled integration of EVs and other steerable loads into the grid.
Connection costs and timelines vary significant by requested power and distance to the nearest grid point.